ABOUT US
SERVICES
GALLERY
PROJECTS
CONTACT
MORE
A Polysewer stormwater attenuation system
A Polysewer stormwater attenuation system installed in saturated sandy ground which required a perimeter dewatering set up to reduce the water table locally to allow installation of the pipework and backfilling to be carried out.
Miller Homes Ltd
Client
£450,000
Contract Value
3 Months
Contract Length